Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
PP PE film granulating production line, PP PE film granulating machine, single stage granulating machine
Model | Extruder | Screw diameter (mm) | L/D ratio | Power | Capacity(PE) | Capacity (PP) |
ZL80 | SJ80-31 | 80MM | 31:1 | 180KW | 180-250(PE) | 100-180(PP) |
ZL100 | SJ100/34 | 100MM | 34:1 | 250KW | 280-350(PE) | 200-260(PP) |
ZL120 | SJ120/36 | 120MM | 36:1 | 320KW | 480-600(PE) | 260-360(PP) |
ZL150 | SJ150-34 | 150MM | 34:1 | 430KW | 650-800(PE) | 400-600(PP) |
Service and other items:
1)Port of loading: Shanghai, China
2)Terms of Payment: 30% T/T Deposit before production, 70% T/T before delivery.
3)Delivery Time: 60 days after receipt of deposit or after signed contract.
4)Period of quality warranty: 18months
5)Observing &Testing
After we receipt 30% advance deposit, we will start to produce. When the machine is completed, buyers come to observe and test machine by themselves, until the machine is satisfied with the buyers, they can pay for the other 70% balance.
6)Technical documents
The seller should supply buyer the documents for installation and commissioning within 5 days after contract is available, other related documents will be supplied to buyer before shipment.
7)After-sale service
After sale service shall be done by the seller. Seller will provide all kinds of technical support to the buyer by telephone, fax or email free of charge. After one-year guarantee period, we assure you life-long maintenance.
8)Installation
We provide electrical control maps and instruction book to you for installation with English instruction. If required, we can send 1 or 2 engineers to buyer’s country for installation and training. But buyer should pay for all expenses, such as: visa, air-tickets, food, accommodation, insurance and also 30 dollars per day for each engineer.