PJ200 of Cantilever Formwork System Used in Construction Building

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1000 m²

Supply Capability:1000000 m²/month

Product Description:

1. Structure of  Cantilever Formwork Description 

The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.


2. Main Features of  Cantilever Formwork

-high bearing capacity

-simple moving procedure by crane

-safe with work platform


3.  Cantilever Formwork Images

 

4.   Cantilever Formwork Specifications

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

① Tensile bolt M30/L= 110

② Anchor shoe

③ Bowl-climbing cone M30/D15

④ High-strength rod D15

⑤ Ancor plate D15



5.FAQ of  Cantilever Formwork

1) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.


2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs  declaration, it may      need 1-2 weeks.