Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:1 unit
Supply Capability:30 unit/month
SC160/160 Desription
Type: Elevators
Place of Origin: Shandong, China (Mainland)
Model Number: SC160/160
Usage: Construction elevator
Drive Type: Rack & Pinion
Elevator Type: Passenger Elevators
Condition: New
Power Source: Electric
Sling Type: Cable
Maximum Lifting Weight: 2*1600KG
Maximum Lifting Height: 150M
Lift Speed: 0-40m/min
Certification: GOST,ISO
Warranty: One year
SC160/160 Features
The SC200/200Construction Elevator is an external construction hoist with a three- drive rack-and-pinion mechanism. It has a rated loading capacity of 2 tons and a rated hoisting height of 150 meters. A simple alteration can change it into a single-cage construction elevator with a rated loading capacity of two tons. The SC200/200Construction Elevator is equipped with a state-patented safety device which can brake automatically in case of accidental fall. The driver element on top of the cage is safe and reliable and convenient for maintenance. The elevator with a maximum hoisting height of 300 meters is widely used for construction work such as industrial and civil construction, bridge construction, underground mining, large chimney construction and the shipping industry. It can be used for transporting materials or people vertically, as a permanent or half-permanent lift, or in places like storehouses and tall towers.
SC160/160 Specifications
SC160/160 Pictures
SC160/160 FAQ
Q: How can we calculate how many mast section we need?
A: Mast section height is 1.508m, you can use the client’s building’s total height divided by the height of mast section, and you will get the quantity of mast section.
Q: How many tie-ins are needed?
A: The tie-in is the linked part between mast and building and it is used to keep the stabilization of the mast. Distance between the tie-in is about 6~9m.