New PVC Pipe for Landscape Drainage Application in 2018

Loading Port:Ningbo

Payment Terms:TT OR LC

Min Order Qty:1000 pc

Supply Capability:100000 pc/month

Product Description:

Product Overview

PP-R (polypropylene random) tube called type three polypropylene pipe and is also called the PP-R pipe or PPR pipe, with energy saving, environmental protection, high strength, corrosion resistance, with smooth inner wall has the advantages of scale, construction and easy maintenance, long service life, widely used in building water supply and drainage, urban drainage city gas and power cable sheath, and industrial fluid transportation, agricultural irrigation construction, municipal, industrial and agricultural fields. The PP-R pipe is made of random copolymerized polypropylene and is extruded into tubes to be molded into tubes


Application

1. Cold and hot water pipe system.

2. Potable drinking water system.

3. Air conditioning pipeline system.

4. Chemical industry pipelines system.

5. Indoor heating system, high temperature radiator heating system


Packaging Details:

1. Large carton: 515 x 400x 220 Cubage: 0.04532 M3 
Small carton: 390x255x250 Cubage: 0.0248 M3 
2. PE poly bag+ carton Delivery Detail: 15 days/ 20" container; 25 days/ 40HQ


Product Description

1.Material   :

PPR

2.Color:

White,   Gray, Green, or as you required.

3.Size:

20-110mm

4.Logo:

CMAX   or Customized

5.MOQ

500pcs

6.Samples   Time:

(1)   4-5days-If you want to customize your logo.

(2)   1day-For our existing samples for reference.

7.OEM   Accepted

Yes

8.Certification   available:

Yes

9.Packing   Details:

Weaving   Bag

10.Production   Capacity:

5,000,000pcs   Per month.

11.Payment   Term:

(1)   L/C,T/T,D/P


Product Show

New PVC Pipe for Landscape Drainage Application in 2018

New PVC Pipe for Landscape Drainage Application in 2018

New PVC Pipe for Landscape Drainage Application in 2018


FAQ

Q1: How Can I Get A Sample?

A1: You can get samples by communicate with our export sales.

Q2: How Long Is Delivery?

A2: Delivery time will be30-45days according to order quantity.

Q3: What Is The MOQ?

A3: MOQ depends on different items.

Q4: What Is Our Normal Payments Terms?

A4: Our normal payment terms now is: T/T, L/C or western union, pay