18T-6300KVA steel scrap coreless induction melting furnace working with CCM,the power compositation less if high voltage input
1.Technical program and specification
This program is recommended that whole set equipment of the furnace shall be equipped with two furnace bodies user can be readjusted by practical needs.
1.1 Technical program
The main equipment of this program is included 6300KVA rectification transformer, 4 low voltage control cabinet, 4 MF power supply cabinet, 2 18t MF induction furnace, 1 hydraulic station, 1 cooling water device, and other auxiliary device.
The output of MF power supply is changed by manual operation, for the purpose of maintenance and alternative melting.
1.2 Technical parameter
Name | Unit | Parameter | Remark | |
Rated capacity | t | 18 |
| |
Max load capacity | t | 22 |
| |
Rated power | kw | 12600 |
| |
Working frequency | Hz | 250 |
| |
Melting rate | t/h | 13~14 | 1600°C | |
Power consumption | kw.h/t | 500~550 | 1600°C | |
Inductor inner diameter | mm | Φ1700 |
| |
hight of inductor | mm | 2260 |
| |
Rated temperature of the melting steel | °C | 1600 |
| |
Incoming voltage of MF cabinet | v | 950 |
| |
electric rectificate mode |
| 24pulse |
| |
Voltage of inductor | V | 3200~3400 | Double voltage | |
cooling water pressure for power source | Mpa | 0.1~0.2 |
| |
Cooling water of the furnace | pressure of incoming water | Mpa | 0.25~0.3 |
|
temperature of incoming water | °C | ≤5~35 |
| |
temperature of the outlet water | °C | ≤55 |
| |
flow rate ( furnace body ) | t/h | 120 | single furnace | |
flow rate (power source) | t/h | 95 |
| |
water temperature rise of power source | °C | 10 |
| |
Hydrauic system | working pressure | Mpa | 12 |
doublemotor, double pump |
flow rate | L/min | 160 |
| |
hydraulic medium |
| antiwear hydraulic oil | summer:N68 winter:N46 | |
diameter of the hydraulic cylinder | mm | Φ250 |
| |
capacity of the transformer | KVA | 6300×2 |
| |
incoming voltage | KV | 10~35 |
| |
secondary voltage | V | 950~1000 |
|
2.Team of payment:40% advance payment by T/T, 60% balance payment by T/T before date of shipment
3. Lead time: 100 days.