Loading Port:Wenzhou
Payment Terms:TT OR LC
Min Order Qty:1000 m²
Supply Capability:200000 m²/month
Specification:
1 | Color | Olive Green& Apple Green, White, Red, Blue |
2 | Coating | PP woven cloth, PU backing |
3 | Material | PE, PP, Nylon, |
4 | Usage | Football, outdoor&indoor |
5 | Yarn Type | Stem, W-shape, S-shape, C-shape |
Product Show:
Installation Step:
Installation and Maintenance:
1.check the entire lawn site needs to be laid, whether the basic density and smoothness meet the requirements, cleaning the site sanitation.
2.paving artificial lawn, in order to make the lawn fold natural expansion, it is recommended to put artificial lawn in the sun, half a day best, at this time should pay attention to the direction of the lodging of the lawn.
3.began laying artificial lawn: in the lawn joint surface of the pavement on the special splicing belt, and with glue fixed on it, the joint area need to transfer more than 10 cm overlap.
4.Apply glue to the bonding surface. Before the drying of the glue, trim the lawn to be tiled and joined, allowing each artificial lawn to bond tightly.
FAQ:
Q1: What about your lead time?
A:Around 10-30days. It depends on current production schedule.
Q2: What is your FOB port?
A:Ningbo or shanghai port,China.
Q3: What is your payment way?
A1) Regular payment way - 30/70
A2) LC at sight.
Q4:Which currencies are acceptable to you?
A:Usually is USD.