Loading Port:Shenzhen
Payment Terms:L/C,T/T
Min Order Qty:1 Pcs pc
Supply Capability:2500 Pcs per Month pc/month
Feature:
High Brightness with Good Heat Sink
High Luminance & High Efficiency
No Flicker and Green Street Light
Excellent Performance and Long Lifetime
OEM & ODM welcome
Specifications:
Body Material: aluminum alloy
LED: powerful light source and energy saving
Working Voltage: AC 85-265v
Power Factor: >0.95
Luminous Flux: ≥90lm/w
Warranty: 3 years
Product parameter:
Model | FT-LD |
Working Voltage | AC 85-265v |
LED Power | 80w-200w |
LED Luminous | >100lm/w |
Color Temperature | 3000k-6500k |
Ra | >65 |
Working Temperature | -40~+50 |
IP | IP65 |
Customizing Options
SAMPLES are avaiable before order.
OEM & ODM service is also avaiable
Our R&D department can design by own or by pictures/samples/draft.
Packing & Delivery
Pakcing:
Standard packing or customized packing;
Cartons outside.
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.