Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:1 set
Supply Capability:1000 set/month
Profile
Main application and scope
Model CD, MD wire rope Electric Hoist is a small-sized and light lifting equipment, which can be mounted on single beam、bridge、gantry and jib crane. With slight modification, it also can serve as winch. Thus, it is widely used in factories、mines、harbors、warehouse、cargo storage areas and shops.It is essential in raising working efficiency and it also can improve working conditions.
Model CD Electric Hoist has only one normal speed, which can satisfy normal supplication. MD Wire rope Electric Hoist is provided two speeds: normal speed and low speed. At a low speed, it can do precise loading and unloading、mounding of sand box、maintenance of machine tools and etc. Thus, MD Wire rope Electric Hoist is more widely used than Model CD.
To meet the needs of lifting heavier cargo, our factory manufactures WH20T and WH32T Electric hoist.
Installation method
First, you need to install the chain box first.
Second, connect the power cord.
When connecting the power cord, must be cut off the power in advance.The ground line should be well grounded at same time, otherwise the operator may feel electric shock when touching any part of the gourd or chain.
Third, the load chain of Lubricated ring chain electric hoist
The lubrication degree of chain is an important factor affecting the service life of load chain.Timely and effective lubrication of load chain can guarantee the effective service life of the chain.
Fourth, check the chain alignment
For multi-chain ring chain electric hoist, should make sure that the hook rack is not flipped.If flipped, return it to normal and ensure that the chain is arranged in line.Do not hang the load on the chain's twisted gourd.
Finally, check the working voltage
Because of the link chain electric hoist out of the factory, they are made according to the user specified voltage or high voltage equipment (only for dual voltage), such as 230/460 v, the operator to check and confirm whether meet the requirements of power supply voltage.If not, please refer to the instructions to meet the required working voltage requirements.
Technical Specification
Type | CD1 MD1 | |||||||||
Lifting capacity(t) | 0.25 | 0.5 | 1 | 2 | 3 | 5 | 10 | 16 | ||
Hoisting height(m) | 3/6/9 | 6/9/12 | 6/9/12/18/24/30 | 6/9/12/18/24/30 | 6/9/12/18/24/30 | 6/9/12/18/24/30 | 9/12/18/24/30 | 9/12/18/24/30 | ||
Hoisting speed(m/min) | 8(0.8/8) | 7(0.7/7) | 3.5(0.35/3.5) | |||||||
Traveling speed(m/min) | 20 | 20/30 | 18 | |||||||
Wire rope | Dia (mm) | 3.6 | 4.8 | 7.4 | 11 | 13 | 15 | 17.5 | ||
specification | 6*19 | 6*37 | ||||||||
Track | 10-20b | 16-28b | 20a-32c | 25a-50b | 32b-50b | 32b-63c | ||||
Min. Curvature radius(m) | 0.8 | 1.5 | 1.5/2/3/4 | 2/2.5/3/4 | 2/2.5/3/4 | 2.5/3/4/4.5/6 | 3.5/4/6/7.5/9 | 3.5/4/6/8/11 | ||
Type | ZD₁12-4 | ZD₁21-4 | ZD₁22-4 | ZD₁31-4 | ZD₁32-4 | ZD₁41-4 | ZD₁51-4
| |||
ZDS₁0.2/0.8 | ZDS₁0.2/1.5 | ZDS₁0.4/3.0 | ZDS₁0.4/4.5 | ZDS₁0.8/7.5 | ZDS₁1.5/13
| |||||
Power(RW) | 0.4 | 0.8(0.2/0.8) | 0.2(0.2/1.5) | 3.0(0.4/3.0) | 4.5(0.4/4.5) | 7.5(0.8/7.5) | 13(1.5/13) | |||
Rotation speed(r/min) | 1380 | 1400 | ||||||||
Current (A) | 1.25 | 2.4(0.72/2.4) | 4.3(0.72/4.3) | 7.6(1.25/7.0) | 11(1.25/11) | 18(2.4/18) | 30(5.2/30) | |||
Type | ZDY₁10-4 | ZDY₁11-4 | ZDY₁12-4 | ZDY₁21-4 | ||||||
Power(RW) | 0.06 | 0.2 | 0.4 | 0.8 | ||||||
Rotation speed(r/min) | 1400 | 1380 | 1380 | 1380 | ||||||
Current (A) | 0.3 | 0.72 | 1.25 | 2.4 | ||||||
No. Of connecting | 120 | |||||||||
Duty classification | Intermediate FC=25% | |||||||||
Power source | Three-phase AC 380 V50Hz | |||||||||
L | 391 | 616/688/760 | 758/856/954/1150/1346/1542 | 820/920/1020/1220/1420/1620 | 932/1038/1138/1327/1533/1738 | 1047/1157/1257/1467/167//1887 | 1602/1783/2145/2507/2869/1872/2092/2532/2952/3387 | |||
L1 | Basic Dimensions (mm) | 78 | 274/364/418 | 345/443/541/737/933/1129 | 352/452/552/752/952/1152 | 380/483/586/792/998/1204 | 415/525/625/835/1045/1255 | 875/1056/1418/1780/2142/1136/1356/1796/2216/2651 | ||
L2 | 216 | 125 | 158 | 187 | 229 | 267 | 301 | |||
L3 | 318/390/462 | 401/499/597/793/989/1185 | 418/518/618/818/1018/1218 | 448/551/654/860/1060/1272 | 485/606/695/905/1115/1325 | 949/1130/1492/1854/2216/1210/1430/1870/2290/2725 | ||||
L4 | 190 | 196 | 240 | 264 | 320 | 376 | ||||
B | 279-315 | 884 | 930 | 1055 | ||||||
H | 423 | 650 | 667/767 | 840/950 | 954/1058 | 1120/1183 | 1350 2100 | |||
d | 17 | 20 | 25 | 25(31) | 25(37) | |||||
b | 185 | 185/270/470/660/860 | 205/280/480/680/880 | 205/320/530/730/940 | 228/340/550/760/920/ | 490/670/1030/1395/1760/860/1080/1520/1940/2375 | ||||
CD1 | Crane weight (KG) | 44/45/46/ | 121/125/130 | 137/145/172/188/204/220 | 221/232/285/309/332/353 | 281/297/354/390/420/451 | 437/495/597/646/686/726 | 1048/1098/1209/1301/1411/1130/1183/1286/1463/1563 | ||
/MD1 | 138/142/147 | 164/174/199/215/231/247 | 256/267/320/344/361/388 | 311/327/384/420/450/481 | 508/532/654/703/743/783 | 1104/1154/1265/1366/1467/1220/1273/1376/1553/1653 | ||||
CD1(FIXED) | 30/31/32 | 89/94/99 | 105/112/120/135159/165 | 166/179/186/209/229/249 | 222/236/250/284/312/340 | 377/400/415/456/493/529 | 795/841/943/1035/1127/850/903/1006/1183/1283 | |||
MD1(FIXED) | 106/111/116 | 132/140/147/162/177/192 | 201/211/221/244/264/284 | 252/266/280/314/342/370 | 430/457/472/513/549/586 | 851/897/999/1091/1183/949/997/1090/1273/1373 |
Installation method
Firstly, you need to install the chain box first.
Secondly, connect the power cord.
When connecting the power cord, must be cut off the power in advance.The ground line should be well grounded at same time, otherwise the operator may feel electric shock when touching any part of the gourd or chain.
Third, the load chain of Lubricated ring chain electric hoist
The lubrication degree of chain is an important factor affecting the service life of load chain.Timely and effective lubrication of load chain can guarantee the effective service life of the chain.
Fourth, check the chain alignment
For multi-chain ring chain electric hoist, should make sure that the hook rack is not flipped.If flipped, return it to normal and ensure that the chain is arranged in line.Do not hang the load on the chain's twisted gourd.
Finally, check the working voltage
Because of the link chain electric hoist out of the factory, they are made according to the user specified voltage or high voltage equipment (only for dual voltage), such as 230/460 v, the operator to check and confirm whether meet the requirements of power supply voltage.If not, please refer to the instructions to meet the required working voltage requirements.