Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:1000 kg
Supply Capability:1000 kg/month
Packaging Detail: | in bulk or as customer's requirment |
Delivery Detail: | 15-30 days after receive the deposit |
Specifications
1.steel tube: OD42&47mm
2.matrerial: Q235
3.surface: painted or galvanize
Picture:
F&Q
1)How about your company?
We, CNBM International Corporation (China National Building Materials Corporation), is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world; We has over 10 year experience in scaffolding industry.
2)Can we provide different size of Frame system Scaffolding as customer need?
The answer is Yes, customer can provide the Tec spec to us and Drawing for production.
3)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.