Kwikstage Scaffolding System for construction use CNBM

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:20 m.t

Supply Capability:3000 m.t/month

Product Description:

1.Quick Details

  • Model Number: KS

  • Type: Kwikstage scaffold

  • Surface: paint/ galvanized

  • Material: steel

  • Standard: AS/NZ 1576

  • Kwikstage Scaffolding System for construction use CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model No: FAS-TIF

Product Name: Scaffolding System--Scaffold Top Interim Frame 

4.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube, Specification(mm): 732(W)x1000(L) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement


Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator