Loading Port:Shanghai
Payment Terms:TT or LC
Min Order Qty:1 unit
Supply Capability:1000 unit/month
JBY Series Hydraulic Walking Pile Frame
JBY series hydraulic walking pile frame is our heavy equipment which is integrated by mechanical ,electrical and hydraulic system .It is specially made for SMW(Soil Mixing Wall) construction, double rotary bushing DTH drill, static drill grounding method etc .This pile frame not only can be hung with various model of SMW construction multi-axis drilling power head, 800 ~ 1200 double rotary casing drill power head, various specifications static grounding construction power head, but also can be used in suspension of hydraulic hammer, vibratory hammer, diesel hammer, long screw, half screw machines, and other kinds of pile foundation construction tools ,to adapt to the job under different working condition, the applicable scope is wide.
Product main features:
1、Reasonable structure, advanced technology, stable performance, high configuration, multi-function, operation is stable and reliable, good appearance, easy disassemble, flexible use, good price.
2、Using the company "asymmetric walking chassis" patent technology (patent number: ZL201120546000.3), small ground pressure, improve the operation stability, strong ability to adapt.
3、The main platform adopt the whole box structure, column and diagonal bar, the shaft bracket structure and connection fasteners adopt high strength material, improve the fatigue strength.
4、The main pump, control valve, pressure meter, quick change of tubing connectors which adopts U.S Danfoss brand(imported original).Hydraulic winch, the electrical components adopts Italy, Germany brand,which have joint venture in domestic.
5、Column is provided with two fine adjustment mechanism,convenient, fast and accurate on pile location and column vertical degree .Column and brace section can be interchanged, can according to the requirements of the construction to adjust the total height of the post.
6、The hydraulic power source is motor drive, low noise, no pollution.Adopt guiding type electro-hydraulic control, the main and vice hydraulic winch all uses hydraulic proportional control ,which realize step-less speed regulation, work steady, operation flexible.
7、Driving room reserved intelligent monitoring system installation location (optional), on the premise of provide standard column with angle gauge, available with inductance load angle monitor (optional), instant feedback column tilt and the size of the drawing load, sound an alarm in dangerous situation.
8、The whole machine adopts building-block type and easy assembly, shaft bracket used telescopic folding structure, platform overhanging beam powered by hydraulic cylinder and use pin shaft rotary structure, removes the trouble of disassembling.Handling down the tubing connection with quick change connectors,easy disassemble, pillar can put up frame work by itself , the overall structure is simple,disassemble ,transportation, use, convenient maintenance, high construction efficiency.
Parameters:
Item | Unit | JBY160 Model | |||
System control method | Electric hydraulic control | ||||
Pillar support method | Three-point support | ||||
Total length of pillar | m | 39 | |||
Diameter of pillar column | mm | 920×12 | |||
Center distance of pillar guide rail | mm | 600×Φ102×10 330×Φ70×8 | |||
The inclination range of pillar | º | 12 ahead/5 back | |||
Max. working ground gradient | º | 3º | |||
The main hydraulic winch | Max.single rope tension | kN | 120 | ||
The second hydraulic winch | Max.single rope tension | kN | 90 | ||
The third hydraulic winch | Max.single rope tension | kN | 30 | ||
Swing angle of platform | º | 0~360 | |||
Swing speed of platform | º/once | 11 | |||
Walking mechanism | Long boat walking speed | m/min | 0~4.3 | ||
Long boat walking pace | mm | 4000 | |||
Short boat walking speed | m/min | 0~4.3 | |||
Short boat walking pace | mm | 600 | |||
Long boat grounding intensity of pressure | MPa | 0.058 | |||
Short boat grounding intensity of pressure | MPa | 0.066 | |||
Hydraulic system | Motor power | kW | 45+30 | ||
Pressure of hydraulic system | MPa | 16.0 | |||
Max. appearance dimension | Working dimension(L×W×H) | mm | 15000×11000×42000 | ||
Transportation dimension(L×W×H) | mm | 11500×3400×3060 | |||
Long boat dimension(L×W) | mm | 11000×1100 11000×1500 | |||
Short boat dimension(L×W) | mm | 6900×1800 | |||
Weight | t | ~165.0 | |||
Driller performance parameters (optional) | Driller model( optional) | ZKD85-3;ZKD100-3; ZKD70-5;SHX1000 | |||
Drilling hole diameter | mm | 650~1000 | |||
Power head power | kW | 90×3、110×2 | |||
Max. drilling depth | m | 30、20 | |||
Max.pulling force | kN | 1440 | |||
Single shaft output speed | r/min | 16 | |||
Output torque | kN.m | 160、130 | |||
Drilling speed | m/min | 0.5~1.0 |
FAQ
To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.
Before sales
Research market with customers; provide technical advice, customized design and production.
On sales
Always communicate and adjust of design with customer to ensure the product satisfy all requirements.
After sales
Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.
Value added services
Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.
Provide high quality and lower price components.
Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.
.
After sales services
1.New machine provides technical train.
2.Once anything goes wrong with the machine by normal using,our technical person must appear at the first time no matter where you are.
3.When the machine should be maintained,you will receive the reminding from us.
4.According to different geological conditions,we will recommend different construction plans for you.
5.Remind you which are wearing parts,so you can prepare enough.
6.24 hours respond to your quality problem.