J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM

Loading Port:Guangzhou

Payment Terms:TT OR LC

Min Order Qty:20 m.t.

Supply Capability:3000 m.t./month

Product Description:

J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 

Name

Ring Lock scaffolding system

Place of Origin

China

Brand name

CNBM

Main Material

Q345 ,Q235

Surface Treatment

High Protected Painted, Powder Coating, Electric   Gavenized, Hot Dip Gavenized.

Color

Silver

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

20ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day

Futures of the J-Stair for Arch Frame/Ladder Frame/All-round System with Q235 Q345 :

Meterial Q345 and Q 235 can be choosed.

Can offer SGS, EN75 and ISO cettifications. 

 

Description of the J-Stair for Arch Frame/Ladder Frame/All-round System with Q235 Q345  

                                               Theory Weight(KG)
 Hot Dip Galv.   Electric Galv.    Painting      PowderCoating  
J-Stair for Arch Frame 5'x6'6" (22" Treads)   40.85    37.14  37.51  37.14
J-Stair for Arch Frame 5'x6'6" (17.72" Treads)  36.70    33.37  33.70  33.37
J-Stair for Arch Frame 5'x6'4" (22" Treads)   40.67  36.97    37.34    36.97
J-Stair for Arch Frame 5'x6'4" (17.72" Treads)  36.52  33.2033.53  33.20
J-Stair for Ladder Frame 5'x5' (22" Treads)  40.5436.85    37.22    36.85
J-Stair for Ladder Frame 5'x5' (17.72" Treads)   36.19  32.90  33.23  32.90
J-Stair for All-round System2130x2000mm(17.72" Treads) 36.80  33.45  33.7833.45
Outer Handrail for J-Stair   14.16  12.88    13.0112.88
 Inner Handrail for J-Stair    9.46   8.60    8.698.60

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM


FAQ

1. What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

2.What are the certifications of your products?

Certified by SGS, BS1139, EN74, Local Test Report.

3. How long is the warranty period for your product?

Our products warranty is 2 years.