Loading Port:Tianjin Port, China
Payment Terms:TT or LC
Min Order Qty:10MT m.t.
Supply Capability:10000MT m.t./month
1.Standard: EN10025, GB Standard, ASTM
2.Grade: Q235B, Q345B, SS400, ASTM A36, S235JR, S275JR
Alloy No. |
Grade |
C |
Mn |
S |
P |
Si |
Q235 |
B |
0.12%-0.20% |
0.3%-0.7% |
<=0.045% |
<=0.045% |
<=0.3% |
4.Sizes: 80mm-200mm
Dimensions | |||||
|
h |
b |
s |
t |
Mass Kg/m |
IPEAA80 |
80 |
46 |
3.20 |
4.20 |
4.95 |
IPEAA100 |
100 |
55 |
3.60 |
4.50 |
6.72 |
IPEAA120 |
120 |
64 |
3.80 |
4.80 |
8.36 |
IPEAA140 |
140 |
73 |
3.80 |
5.20 |
10.05 |
IPEAA160 |
160 |
82 |
4.00 |
5.60 |
12.31 |
IPEAA180 |
180 |
91 |
4.30 |
6.50 |
15.40 |
IPEAA200 |
200 |
100 |
4.50 |
6.70 |
17.95 |
Applications of IPEAA Beam
1. structure construction and electronic tower building construction
2. bridge, trestle, autos, brackets, machinery
3.It is widely used in various building structures and engineering structures such as roof beams, bridges, transmission towers, hoisting machinery and transport machinery, ships, industrial furnaces, reaction tower, container frame and warehouse etc.
Package & Delivery Terms of IPEAA Beam
1. Packing: it is nude packed in bundles by steel wire rod
2. Bundle weight: not more than 3.5MT for bulk vessel; less than 3 MT for container load
3. Marks:
Color marking: There will be color marking on both end of the bundle for the cargo delivered by bulk vessel. That makes it easily to distinguish at the destination port.
Tag mark: there will be tag mark tied up on the bundles. The information usually including supplier logo and name, product name, made in China, shipping marks and other information request by the customer.
If loading by container the marking is not needed, but we will prepare it as customer request.
4. All the IPEAA Beams will be delivered to the port of Tianjin within 45 days after receiving the Original L/C at sight or the advance payment by T/T.
5. Transportation: the goods are delivered by truck from mill to loading port, the maximum quantity can be loaded is around 40MTs by each truck. If the order quantity cannot reach the full truck loaded, the transportation cost per ton will be little higher than full load.
Production Flow of IPEAA Beam
Material prepare (billet) —heat up—rough rolling—precision rolling—cooling—packing—storage and transportation