industrial smelting furnace

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Specifications

Our industrial smelting furnace and medium Frequency Induction Furnace with technology of dual Track furnaceDual Track furnace



Product Description

Our industrial smelting furnace for melting steel to produce billets and rebar etc.

Detail spec.:

1ton Dual track KGPS induction furnaceMedium Frequency Induction Furnace Dual Track furnace

Technical parameter

Item

Unit

Data

Furnace parameter

1t

Rated capacity

t

1

Maximum capacity

t

1.2

Induction coil inside diameterΦ

mm

700

Induction coil height

mm

820

Maximum working temperature

°C

1750

Electrical parameter

Transformer capacity

KVA

1000

Transformer primary voltage

KV

10

Transformer secondary voltage

V

660

Rated power of MF power supply

KW

800

Maximum output voltage of MF power supply

V

1450

Coil voltage

V

2900

Rated working frequency

Hz

1000

Power supply convert frequency

%

96

Startup successful frequency

%

100

Composite parameter

Melting rate(rise to 1450°C)

t/h

1.4

Melting power consumption (rise to 1450°C)

KW.h/t

580

Working noise

db

≤75

Hydraulic system

Hydraulic station capacity

L

200

Working pressure

MPa

11

Hydraulic medium

Hydraulic oil

Cooling water system

flow

M3/h

34

Water supply pressure

MPa

0.2~0.3

Inlet water temperature

°C

5~35

Outlet water temperature

°C

35~55

The way of rectifier transformer what is our company recommended as follow:

The specification of rectifier transformer (double 6-pulse)

Furnace capacity

Power of MF power supply(KW)

Transformer

Capacity(KVA)

Voltage combination

Coupling

group

mark

Impedance voltage

(%)

Primary

side (KV)

Secondary

side

(V)

1t

800

1000

10

660

Δ/Y0-12

6~8

0          

1          Remark:It should be has no-load voltage adjustment switch in high voltage side of transformer, the voltage is adjusted at -0.5%, 0, +0.5% 3 level.

The rectifier tube and inverter tube are chosen as follow specification:

Furnace model

KK tube

KP tube

1t

KK—1200A/1800V

KP—1000A/2200V