I BEAM

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Specifications of IPE/IPEAA Beam Steel

1. Product name: IPE/IPEAA Beam Steel

2. Standard: EN10025, GB Standard, ASTM, JIS etc.

3. Grade: Q235B, A36, S235JR, Q345, SS400 or other equivalent.

4. Length: 5.8M, 6M, 9M, 10M, 12M or as your requirements

IPE/IPEAA

Section

Standard Sectional Dimensions(mm)

h

b

s

t

Mass Kg/m

IPE80

80

46

3.80

5.20

6.00

IPE100

100

55

4.10

5.70

8.10

IPE120

120

64

4.80

6.30

10.40

IPE140

140

73

4.70

6.90

12.90

IPE160

160

82

5.00

7.40

15.80

IPE180

180

91

5.30

8.00

18.80

IPE200

200

100

5.60

8.50

22.40

IPE220

220

110

5.90

9.20

26.20

IPE240

240

120

6.20

9.80

30.70

IPE270

270

135

6.60

10.20

36.10

IPEAA80

80

46

3.20

4.20

4.95

IPEAA100

100

55

3.60

4.50

6.72

IPEAA120

120

64

3.80

4.80

8.36

IPEAA140

140

73

3.80

5.20

10.05

IPEAA160

160

82

4.00

5.60

12.31

IPEAA180

180

91

4.30

6.50

15.40

IPEAA200

200

100

4.50

6.70

17.95

IPE/IPEAA

Applications of IPE/IPEAA Beam Steel

IPE/IPEAA Beam Steel are widely used in various construction structures, bridges, autos, brackets, mechanisms and so on.

Packing & Delivery Terms of IPE/IPEAA Beam Steel

1. Package: All the IPE/IPEAA Beam Steel will be tired by wire rod in bundles

2. Bundle weight: not more than 3.5MT for bulk vessel; less than 3 MT for container load

3. Marks:

Color marking: There will be color marking on both end of the bundle for the cargo delivered by bulk vessel. That makes it easily to distinguish at the destination port.

Tag mark: there will be tag mark tied up on the bundles. The information usually including supplier logo and name, product name, made in China, shipping marks and other information request by the customer.

If loading by container the marking is not needed, but we will prepare it as customer request.

4. Shipment: In containers or in bulk cargo

IPE/IPEAA Beams

IPE/IPEAA Beam

5. Delivery time: All the IPE/IPEAA Beam Steel will be at the port of the shipment within 45 days after receiving the L/C at sight ot the advance pyment.

6. Payment: L/C at sight; 30% advance payment before production, 70% before shipment by T/T, etc.

Production flow of IPE/IPEAA Beams

Material prepare (billet) —heat up—rough rolling—precision rolling—cooling—packing—storage and transportation

IPE/IPEAA