Hydraulic self climbing scaffolding、Hydraulic climbing protection platform

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:10 set

Supply Capability:500 set/month

Product Description:

All-steel new type hydraulic climbing protective platform system

 All-steel climbing will be upgraded on the basis of attached lifting all-steel climbing scaffolding, it will be applicable to any buildings: high-rise residential buildings, high-rise office buildings, industrial buildings, etc. With the development of the construction industry, all-steel climbing frame will directly replace the previous 70's and 80's domestic steel pipe scaffolding, steel pipe suspension scaffolding, disc buckle scaffolding, door type scaffolding,etc.  All-steel climbing scaffolding has the advantages of low carbon, environmental protection, high turnover performance, high content of artificial intelligence science and technology, and low cost of project measures. With the increasing height of domestic market buildings, all-steel climbing scaffolding will play the most important role in high-rise building construction machinery.   

 

 

Hydraulic self climbing scaffolding、Hydraulic climbing protection platform

Hydraulic self climbing scaffolding、Hydraulic climbing protection platform


Under the above background, many building developers pursue low-cost protective operation platform scaffolding under the condition of powerful function and good stability. In view of the above situation, we specially designed an improved hydraulic protection operation platform. As the main product in the unique climbing scaffolding market, compared with the conventional climbing protection platform system, the product simplifies the lifting components and lifting points, reduces the processing cost and simplifies the manufacturing process.

 

Change it into hydraulic cylinder type, and make a comparison on the basis that the whole building needs 50 seats. The investment of electric hoist is about 200,000 yuan. The special lifting components of climbing scaffolding system need 150,000 yuan. On this basis, additional electric and electronic control systems need about 100,000 yuan, so the cost of electric hoist system is 450,000 yuan. However, the whole building only needs two hydraulic cylinders and one pump station to realize the whole building's lifting operation. But it needs to divide 50 machine positions into 25 times for independent lifting. The actual cost of the system is 30,000 yuan. Therefore, under this background, the market and prospects of the hydraulic cylinder lifting operation protection platform can be realized.It has a decisive influence on the development of overseas market.

 

 

Technical features


1All-steel lightweight design, the frame structure can adapt to a variety of installation methods, it can be ground assembly or high-altitude structure installation.

2All-steel material to avoid potential fire hazards.

3Fully enclosed protection, internal construction work, safe and convenient.

4The grouping design of frame structure can reduce the drawbacks of too much labor needed for climbing care because of the long perimeter of the building, simplify the workload of lifting and the labor input, and divide the climbing operation into several sections for pipeline construction.

5Neat and beautiful appearance improves the civilized construction image. To be the scaffolding which saves your worry.

 

Three - dimensional diagram of hydraulic climbing frame

Project photos

Project photos

Project photos

Frame perspective

Frame perspective

Frame outside elevation rendering


Item No

Project

Unit

Technical parameters

Remark

1

Single machine-position size

Length

m

5

Sample machine:

5m×0.71m×18m

Construe level height:

H-3.8m

2

Width

m

0.7-1.2

3

Height

m

(3.5-5)H

4

Max span distance between machine-positions

m

5


5

Inner row vertical props distance from wall

m

0.67


6

Single machine-position power

KW

1.5


8

Single machine-position rated lifting weight

Kg

5000


9

Max construction loading

KN/

2

3

Construction levels

10

Single machine-position weight

Kg

2800


11

Lifting speed

mm/min

100-400


12

Single machine-position upper and bottom attached point distance

m

H


13

Braking distance of anti-falling safety device

mm

100