Hydraulic Motor for Schwing Concrete Pump

Loading Port:Shanghai

Payment Terms:TT or LC

Min Order Qty:1 pc

Supply Capability:500 pc/month

Product Description:

Product Description

.OMP hydraulic motor graph paramaters, you can gain  your type from here as reference 

Type 

OMP

36

OMP

50

OMP

80

OMP

100

OMP

125

OMP

160

OMP

200

OMP

250

OMP

315

 

OMP

400

OMP

500

Displacement 

(cc/rev)

36

51.7

77.7

96.2

120.2

157.2

194.5

240.3

314.5

389.5

486.5

Max torque

(n.m)

cont

55

100

146

182

236

302

360

460

475

490

430

int

76

128

186

227

290

370

440

570

555

580

430

Max pressure

(Mpa)

cont

12.5

14

14

14

14

14

14

14

9.0

7.0

7.0

int

16.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

14

11.5

9.0

Max  speed
rate

(rpm)

cont

1500

1150

770

615

490

383

310

250

192

155

120

int

1650

1450

960

770

615

475

385

310

240

190

150

Weight

(kg)

5.6

6

5.7

5.9

6.0

6.2

6.4

7.0

6.9

7.4

8.0

 

FAQ:

Q1: Why buy Materials & Equipment from us?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some OMP hydraulic motor according to customers request?

A4: Yes, we can produce OMP hydraulic motor according to the difference country situations and different concrete  pump to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:We have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

Hydraulic Motor for Schwing Concrete Pump

Hydraulic Motor for Schwing Concrete Pump

Hydraulic Motor for Schwing Concrete Pump