Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Material: | |||||
Color: | Package: | Shipment: | |||
Service: | Application: |
Packaging Detail: | Pallet packing cuplock scaffold |
Delivery Detail: | 30-45 days after received advance |
galvanized cuplock scaffolding system
standard tube: 48.3*3.2mm,Q345
ledge tube:48.3*3.2mm,Q345
brace tube:48.3*3.2
Hot sale best price widely used galvanized cuplock scaffolding system
We supply galvanized / painted steel scaffolding planks which have a non-slip working surface. We use all modern techniques in the manufacturing of our world class products. Scaffolding steel planks can be manufactured as per customer’s specification and sizes also.
Length | Also |
3.0m | 2.8m |
2.5m | 2.3m |
2.0m | 1.8m |
1.5m | 1.3m |
C-lock standard verticals are manufactured from 4.8mm O.D. Tube, Provided in various sizes with cup joints welded at 500mm, intervals. The top cups are made from malleable castings to endure rough site handling, and welded bottom cups are pressed from high quality steel.
Welded bottom cups are pressed from high quality steel and captive mobile top cups made out of malleable casting provide firm grip to ledger blades making the connection rigid and to endure rough site handling.
Produces from tube thickness – 3.2mm or 4.0mm