Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:10000 pc
Supply Capability:10000 pc/month
Brand Name: | ADTO | Model Number: | CPS | ||
Material: | Q235,Q345 | Delivery Time: | Within 20 days after prepayment received | Payment Term: | T/T,L/C |
Packaging Detail: | In bundle by steel strip or in waterproof packing |
Delivery Detail: | Within 20 days after receive the L/C or Deposit |
Cup-Lock Scaffolding System for applications as formwork support,general access scaffold,staircase tower,mobile tower,table form
Cup-Lock Scaffolding System
The unique node locking method which allows up to four horizontal members to be fastened to a vertical member in one action by a single hammer blow - without the use of nuts and bolts or wedges.
Components: Cup-Lock Standard With Spigots, Cup-Lock Ledger, Cup-Lock Diagonal Brace, Top & Bottom Cup, Blades, Steel Plank, Steel Stair Case and Steel Base Jack.
Product Feature:
-Simple. Components allow the easy creation of cantilevers, inside platforms and stair cases.
-Lighter. 20% lighter than Coupler & Pin Scaffolding System
-Safe to erect and use
Cup-Lock Standard/ Vertical
Standard with Spigots
Description | Weight |
1.0M Cup-Lock Standard, Hot Dipped Galvanized | 5.5kg |
2.0M Cup-Lock Standard, Hot Dipped Galvanized | 11.4kg |
3.0M Cup-Lock Standard, Hot Dipped Galvanized | 16.6kg |
Cup-Lock Standard Without Spigots
Description | Weight |
0.4M Cup-Lock Standard, Hot Dipped Galvanized | 2.4kg |
0.8M Cup-Lock Standard, Hot Dipped Galvanized | 4.6kg |
1.3M Cup-Lock Standard, Hot Dipped Galvanized | 6.6kg |
1.8M Cup-Lock Standard, Hot Dipped Galvanized | 9.1kg |
2.3M Cup-Lock Standard, Hot Dipped Galvanized | 11.6kg |