Hot-dip Zinc Coating Steel Building Roof Walls -Smooth and Flat Surface

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:50 m.t.

Supply Capability:10000 m.t./month

Product Description:

 

Hot-dip Zinc Coating Steel Building Roof Walls -Smooth and Flat Surface
1.Structure of Hot-Dip Galvanized Steel Sheet Description

Hot-dip galvanized steel coils are available with a pure zinc coating through the hot-dip galvanizing process. It offers the economy, strength and formability of steel combined with the corrosion resistance of zinc. It is especially useful for countless outdoor and industrial applications. Production of cold formed corrugated sheets and profiles for roofing, cladding, decking, tiles, sandwich walls, rainwater protective systems, air conditioning duct as well as electrical appliances and engineering.

2.Main Features of the Hot-Dip Galvanized Steel Sheet

• Smooth and flat surface

• Workability, durability

• High strength

• Good formability

• Good visual effect

3.Hot-Dip Galvanized Steel Sheet Images

Hot-dip Zinc Coating Steel Building Roof Walls -Smooth and Flat Surface

Hot-dip Zinc Coating Steel Building Roof Walls -Smooth and Flat Surface

 

4.Hot-Dip Galvanized Steel Sheet Specification

Standard: ASTM, JIS,EN

Grade: CS, DX51D+Z,SGCC, SS 230~550,S220GD+Z~S550GD+Z, SGC340~SGC570

Thickness: 0.18mm~5mm

Width: max 2000mm

Coil weight:3-12 MT

Coil ID:508/610mm

Surface structure: zero spangle, regular spangle or minimum spangle

Surface treatment: Chromate treatment, Oiled/dry, skinpassed/non-skinpassed

Packing: Standard seaworthy export package

 

 

5.FAQ of Hot-Dip Galvanized Steel Sheet

 1.How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market.

2. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-30 days, but the shipment will depend on the vessel situation.