Hot-dip Galvanized Steel Coil for Dry-wall

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:25 m.t.

Supply Capability:20000 m.t./month

Product Description:

1.Structure of Hot-dip Galvanized Steel Description

Hot-dip Galvanized steel coils are available with a pure zinc coating through the hot-dip galvanizing process.Along with it many kinds of new  technology and new process of global cold rolling production have been applied. Therefore the quality of the goods could be guaranteed. The product is widely used in outdoor and interior decoration, furnishing manufacturing, home appliance, automobile etc.

2.Main Features of Hot-dip Galvanized Steel

• Excellent process capability

• Smooth and flat surface

• Workability, durability

• Excellent heat resistance performance

• High strength

• Good formability

• Good visual effect

 

3. Hot-dip Galvanized Steel Images

 

 

4.Hot-dip Galvanized Steel Specification

Standard: ASTM A653M,EN10327,JIS G 3302

Grade: CS, DX51D+Z,SGCC

Thickness: 0.15mm~3.5mm

Width: 1250,600-1250mm

Coil weight:3-10 MT

Coil ID:508/610mm

Chemical composition:

C

Si

Mn

Cr

Ni

P

S

0.150

0.476

11.231

12.50

0.900

0.039

0.010

 

 

 

 

 

 

 

 

 

5.FAQ of Hot-dip Galvanized Steel

We have organized several common questions for our clients,may help you sincerely:

1.How about your company

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customers requirements.

2.How to guarantee the quality of the products

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

3. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.