High Productivity Automatic FRP/GRP Tank Making Machine in High Quality

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1 set

Supply Capability:30 set/month

Product Description:

High Productivity Automatic FRP/GRP Tank Making Machine in High Quality

Product Description:

It's popular for site work, It is controlled by PLC. After input/preset the parameter, the computor can calculate and design the product data automatically, then control the rotating speed of moulds and moving of dolly to achieve loop winding, across winding and spiral winding.

Product Features:

1.Controlled by PLC.

2.Automatic.

3.High anti-fire, High anti-corrosion and anti-aging, High anti-slippery.

Product Parameter:

Name

High Productivity Automatic FRP/GRP Tank  Making Machine in High Quality

Brand

CMAX

Weight

5-13T

Dimension(L*W*H)

4.6m*1.3m*2.5m

Power

50-90KW

Voltage

220V

Product Type

FRP Machinery

Certification

ISO9001:2008

Application

Granules

Raw material

Fiber Reinforced Plastic

Place of Origin

Hebei, China (Mainland)

Color

Blue

Warranty

12 Months

Time of Delivery

30-45 days

Product Pictures:

High Productivity Automatic FRP/GRP Tank Making Machine in High Quality

High Productivity Automatic FRP/GRP Tank Making Machine in High Quality

High Productivity Automatic FRP/GRP Tank Making Machine in High Quality

Our Services:

Sales Service:

1. We promise to be honest and fair, it's our pleasure to serve you;

2. We guarantee punctuality of delivery, quality and quantities to be strictly the same as the terms describe in the

contract. 

After-sale services:

1. We provide you with aftersales installation, trainning and 12 months warranty.

2. 24 hours online telephone service.

3. A large stock of components and parts, easily-worn parts.

FAQ:

Q:How  can I get a sample from you?

A: We offer the sample you want for free. After we know clearly about you inquiry about the product, we will preparethe samples and send to you immediately if they are available. What you need to do is just tell the detailed address,contact method.

Q: How long is the lead time?

A:  Our lead time will be about 30-45 days after we received your advanced payment.