High Load Bearing Girder Box Formwork

Loading Port:XINGANG

Payment Terms:TT or L/C

Min Order Qty:1 Set/Sets set

Supply Capability:200,000 Ton/Tons per Year set/month

Product Description:

Detailed Product Description High Load Bearing Girder Box Formwork for Preformed Unit

 

bridge deck formwork

High Load Bearing Girder Box Formwork for Preformed Unit

 

 

Description of  High Load Bearing Girder Box Formwork :

 

1. Brief introduction of High Load Bearing Girder Box Formwork for Preformed Unit

 

GB system-B is a kind of formwork especially for performed box girder in bridge floor construction.

 

 

High Load Bearing Girder Box Formwork

 

2. Competitive advantage of  High Load Bearing Girder Box Formwork


①. Assembling is easier makes high construction efficiency.

 

②. Pouring object surface is smooth and beautiful.
The formwork is made of steel material with higher load bearing capacity and stronger stiffness that makes perfect surface on concrete.

③.Good economic performance

The cost will be greatly reduced by its long service life and more turnover times.

3. Applications of High Load Bearing Girder Box Formwork for Preformed Unit

 

 

 High Load Bearing Girder Box Formwork