Loading Port:Tianjin
Payment Terms:TT or LC
Min Order Qty:50 m³
Supply Capability:8000 m³/month
1)size:1220*2440*(9-30mm) and 1250*2500*(9-30mm)
2)core:poplar,combi,etc
3)glue:Mr,melamine,WBP
4)CE,CARB
Description:
Detailed Product Description | ||
Place of origin | Jiangsu China | |
Face&back | Black film, brown film, red film, anti-slip film | |
Core | Poplar, Combi, Birch, eucalypts | |
Size | 1220*2440/1250*2500mm and as your requirement | |
Thickness | 2mm to 30mm and as for your requirement | 1/8 inch(2.7-3.6mm) |
1/4 inch(6-6.5mm) | ||
1/2 inch(12-12.7mm) | ||
5/8 inch(15-16mm) | ||
3/4 inch(18-19mm) | ||
Thickness tolerance | 2-6mm: +/-0.2mm | |
6-30mm: +/-0.3mm | ||
Grade | first class | |
Glue | MR,Melamine,WBP Phenolic | |
Moisture | ≤12% | |
Joint way | Overlap joint, end joint, scraf joint, finger joint | |
Strength | High bending strength Strong nail holding | |
Quantity | 8 pallets/20ft,16 pallets/40ft,18 pallets/40HQ | |
Usage | construction,formwotk system | |
Certificate | ISO9001: 2000; CE | |
Main market | Middle East, Southeast Asia, South America, Africa |
1.Why Choose Us?
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
2.How about the shipping?
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Steel Frame Formwork GK120, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.