HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--019

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1000 m³

Supply Capability:500000 m³/month

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.