Heavy Duty Cuplock Scaffold for Construction

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:100 kg

Supply Capability:100000 kg/month

Product Description:


1. Main Features of CMAX Heavy Duty Cuplock Scaffold System

- the cup-lock scaffolding is more safe and reliable;

- convenient ,redundant utilization ration higher merit. 

- low pressure fluid high strength welded pipe, welds through the carbon dioxide protection according to the specific shape welding. 

- suitable specially for high-rise construction project constructions and so on the construction inside and outside scaffold, bridge, multi-level crossing bridge, tunnel, subway, also may take the mechanical and electrical installment, the paint whitewash, the equipment service, the advertisement manufacture activity working platform.

 

2. CMAXHeavy Duty Cuplock Scaffold System Project View

Heavy Duty Cuplock Scaffold for Construction

Heavy Duty Cuplock Scaffold for Construction

 

Heavy Duty Cuplock Scaffold for Construction

 

4. FAQ of  CMAX Heavy Duty Cuplock Scaffold System

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

- If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

- If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express, by air/ sea etc.  

Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.