Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Model Number: | |||||
material: | color: | life span: | |||
surface finished: Painted: | Thickness: |
Packaging Detail: | nil |
Delivery Detail: | 7--10days |
Door Frame Scaffolding
1.good bearing capacity
2.durable & stable
3.easy to assemble & dismantle
4.quite flexible
Door frame scaffolding system/door frame scaffolding system
1.One set of Door Frame Scaffolding usually include 2pcs of main frames, 2 pairs of cross brace and 4pcs of joint pins.
2. Door Frame Scaffolding is easy and quick to install and strip.which can save your time.
3.DoorFrame scaffolding can be used for both interior and exterior building construction if matching with different accessories. like caster wheel,jack base, u head,etc.
4.All theDoor Frame Scaffolding parts are dealt with CO2 arc welding, the surface is painted. As a result, it is more durable and has a longer working life
5.Door Frame Scaffolding is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.