Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
size(mm) | tensile strength (mpa) |
0.80—3.50 | 340--550 |
size(mm) | coil size | spool packing | big coil packing | |
ID (mm) | OD (mm) | |||
0.80—1.60 | 14、16 cun | 1—100㎏ axis | 250-400 | 400-770 |
1.61—3.50 | 450 508 | 800 840 |
Size mm | Min. zinc coating (g/㎡) | |
A1 | B2 | |
〉0.80-1.00 | 150 | 120 |
〉1.00-1.20 | 180 | 150 |
〉1.20-1.40 | 200 | 150 |
〉1.40-1.60 | 220 | 150 |
〉1.60-1.80 | 220 | 180 |
〉1.80-2.20 | 240 | 190 |
〉2.20-2.50 | 260 | 210 |
〉2.50-3.00 | 275 | 240 |