Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Size (mm) | Tolerance (mm) | Stress at 1% extension min /Mpa | Tensile strength min /Mpa | Elongation min */% | Wrapping test standard core dia. /mm | Torsion test min / number of turns | |
> | ≤ | ||||||
1.24 | 2.25 | ±0.03 | 1550 | 1870 | 2.0 | 4D | 14 |
2.25 | 2.75 | ±0.04 | 1550 | 1870 | 2.0 | 4D | 14 |
2.75 | 3.00 | ±0.05 | 1550 | 1870 | 2.5 | 5D | 12 |
3.00 | 3.50 | ±0.05 | 1550 | 1870 | 2.5 | 5D | 12 |
3.50 | 4.25 | ±0.06 | 1550 | 1870 | 2.5 | 5D | 10 |
4.25 | 4.75 | ±0.06 | 1510 | 1870 | 2.5 | 5D | 10 |
4.75 | 5.50 | ±0.07 | 1510 | 1870 | 2.5 | 5D | 10 |