Galvanized Steel Sheet Gi Coil for Building Materials

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:50 m.t.

Supply Capability:10000 m.t./month

Product Description:

Basic Info.

Model NO.:ST010

Standard:ASTM, JIS, GB, AISI, DIN

Steel Grade:Q195

Certification:ISO, SGS, BV, RoHS, IBR

Surface Treatment:Galvanized

Technique:Cold Rolled

Application:Packing,Gutter Ect.

Edge:Mill

Stock:Stock

THK:0.13-3mm

Width:10mm-550mm

Inner Diameter:200mm to 600mm

Export Markets:Global

 

Additional Info.

Packing:Wood Pallets

Standard:OEM

Origin:China

Production Capacity:30000 Tons Each Month

Product Description

1. Thickness: 0.18-1.5mm;
2. Width: 50-914mm;
3. Hardness: 380MPa-450MPa;
4. Specification: 0.35*50, 0.4*45, 0.4*65, 0.4*68, etc.;
5. Surface waxed and edges deburred;
6. Standard: As per buyers' specifications among Q195-Q345B in the GB standard;
7. Package: Inner is protect humidity-proof waw paper, medium is plastic film, outer is sackcloth or compound paper packing, or as per customer's requirements.

StandardAISI, ASTM, BS, DIN, GB, JIS, etc
GradeSGCC, DX51D, DX53D, DX54D, etc
Thickness0.14-2.5mm
Widthless than 600mm
Inner Diameter508/610mm
Coil Weight1.5-4.0T
Zinc Coating60g/m 2 -180g/m 2
Spangle Stateregular spangle, small spangle, big spangle, non-spangle
Surface TreatmentChromate, Oil, Lacquer Seal, Phosphating, etc 

 

Product show:

 

Galvanized Steel Sheet Gi Coil for Building Materials

Galvanized Steel Sheet Gi Coil for Building Materials

 

 

Package:

 

Galvanized Steel Sheet Gi Coil for Building Materials

Galvanized Steel Sheet Gi Coil for Building Materials

 

FAQ:

 

1. What is the minimum order quantity ?  

Our MOQ is 50mt for each size. And we will consider to give more discount if you make big order like 1000 tons and more. Further more, the more appropriate payment term your offer the better price we can provide. 

2. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.

3. How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

4.What is the validity of your quotation? 

Normally 7 days.

5.What is your advantage?

24 hour quick response /Customer oriented/ Credit foremost/ Top quality Excellent