Loading Port:Qingdao
Payment Terms:TT or LC
Min Order Qty:1000 pc
Supply Capability:2000000 pc/month
1. Structure of Galvanized Steel Plank
Ringlock Scaffolding system is also called Modular Scaffolding and Multidirectional Scaffolding, the junction enables quick and easy connection of load bearing items as well as reinforcing parts to each other with an enormous rigidity. Ringlock System Scaffolding Standard for Construction is a tube of D48*3.5mm which material is Q235/Q345B, Galvanized Ringlock System Scaffolding 。Ledger for Construction is made by a tube with two wedge welded on the ends separatel,Galvanized Steel Plank by pre-galvanized steel
Ringlock scaffolding is the new generation product of cuplock sacffolding.The buckle part is a disc which diameter 133mm,and thickness 10mm. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many disc every specific distance ,there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately
Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.
We can supply various scaffoldings of different types in superior quality at the best price with best service!
2.Main Features of Galvanized Steel Plank
Reliable performance
Corrosion resistance
Durable finish standards
Strong anti-sliding performance
Manugacture
Good service
3. images of Galvanized Steel Plank
4. Specification of Galvanized Steel Plank
Raw Material: steel
Size: 500-3000 mm or customer demanded
Certifies:, Element
Technology : Forging / welding
Surface treatment: Electro galvanized, Hot DIP galvanized, or painted
Brand Name:FF
Useage: connecting the scaffolding pipe
OEM service offered
5.FAQ of Galvanized Steel Plank
Why you choose us ?
1)Highest quality -never use any equipment that is damaged or deteriorated in any way
2)Safety -inspect all equipment before using
3)Competitive price - factory suppler direct
4)We have strong engineering team that can give best solution for your project
5)Cutting -Edge product development
Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances
Our firm belief that our customer's success are the only guarantee of our success .
Package ?
All the products package are suit for the sea transportation, steel and wooden plate is usual, if you need special package, Pls contact me for detail, we will meet your demands.
Delivery Time ?
For one 20GP container, the delivery time is about 15-25 days,
For 1-5 20GP containers, the delivery time is about 15-50 days.
For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.
Product Quality
1) we can send you the samples for your checking our quality.
2) If you have time ,we welcome your coming to visit our factory.
Scaffolding refers to the construction site for workers operation and solve the vertical and horizontal transportation and erection of all kinds of support.Architecture of the generic term, refers to the construction site in exterior, interior, or higher storey height can't construction directly.Scaffolding compared with the general structure, the working conditions has the following characteristics: 1, by load variation;2, fasteners, belong to semi-rigid connection nodes and node rigid size is associated with fastener quality, installation quality, node performance there is a big variation;3, scaffolding structure and component of initial defects, such as initial bending of bar, rust, erection of dimension error, the eccentric load, etc.;4, and the wall connection, bigger binding variation on the scaffold.The above accumulation and statistical data, the study of the problems of the lack of system does not have independent probability analysis condition, so the structural resistance adjusting multiplied by the coefficient of less than 1 its value system with using the safety factor of the calibration.Therefore, the specification adopts the design method of essentially belongs to half probability, half experience.The structure of the scaffold to satisfy the provisions of this specification requirement is the basic conditions of design and calculation.