Galvanized Forged Swivel Coupler with Casting Steel Wedge Head

Loading Port:Qingdao

Payment Terms:TT or LC

Min Order Qty:1000 pc

Supply Capability:2000000 pc/month

Product Description:

1.Structure of Galvanized Forged Swivel Coupler with Casting Steel Wedge Head

Scaffolding Coupler is accessories of the scaffolding productions , it is usually made of Q235 steel material , The production technology can be forging or prssed  , With the development of the construction , Scaffolding Coupler  Steel Galvanized Forged  Swivel Coupler with Casting Steel Wedge Head   has beome more and more popular. 

 

Scaffolding Coupler  Steel Galvanized  Forged    Coupler  used to connect two scaffolding tubes at certain direction . The scaffolding coupler used to connect tubes and bulid hige woking towers .It can be used to 48.3mm tube or 48.3mm and 60mm tube  Every size avaliable . 

 

We can manufacture all kinds of couplers, include: British type couplers, Italian type couplers, German type couplers, American type couplers, and many other kinds of couplers as per your drawings.

 

2.Main features of Galvanized Forged Swivel Coupler with Casting Steel Wedge Head  

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Galvanized Forged Swivel Coupler with Casting Steel Wedge Head images 

Scaffolding Coupler  Steel Galvanized Forged  Swivel Coupler with Casting Steel Wedge Head

 

Scaffolding Coupler  Steel Galvanized Forged  Swivel Coupler with Casting Steel Wedge Head

4.Galvanized Forged Swivel Coupler with Casting Steel Wedge Head Specification 

 Raw Material: Q235

 Size: 48.3mm

 Weight:1.93kg

 Certifies:, EN 74 and OSHA

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered

5.FAQ of Galvanized Forged Swivel Coupler with Casting Steel Wedge Head
Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 

Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.