Furring Channel and U channel for Ceiling

Loading Port:Tianjin

Payment Terms:TT or LC

Min Order Qty:1000 pc

Supply Capability:500000 pc/month

Product Description:

Furring Channel and U channel for Ceiling

 

1. Galvanized Steel Profiles raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.
2. Hot dipped zinc galvanized stee strip zinc coating is 80-180g/m2.
3.Warm sales in Middle East , Africa ,  Malaysia ,and America , which have enjoyed an excellent reputation with high quality and services
4. The specification can follow up customer requirments.
5. Advanced equipment can make sure exactly size, high quality products.

 

Detail description

Specification for middle east:
Main Channel  38*12
Furring Channel  68*35*22
Wall angle 25*25 
C stud 50*35 
C Stud 70*35 
C stud  75*35 
U track  52*25 
U track  72*25 
U track   75*25

 
Specification to Australia:
top cross rail 25*21*0.75
25*21*0.75
Furring Channel 28*38*0.55
16*38*0.55
Furring Channel track 28*20*30*0.55
16*20*30*0.55
 
Stud 64*33.5*35.5
76*33.5*35.5*0.55
Stud 92*33.5*35.5*0.55
150*33.5*35.5*0.55
Track 51*32*32, 64*32*32*0.55

76*32*32*0.55
Track 92*32*32*0.55

  

Specification to Europe, Russia; Ukraine;Georgia. ect

C Stud 60*27
U track 28*27
C stud 50*50
C stud 75*50
C stud 100*50
U track 50*40
U track 75*40
U track 100*40

Function and advantage

1.good quality, hot dip galvanized steel coil

2.light weight , easy install

3.surface: zinc coat, full with dot, high strength

4.strong bearing capacity, ametabolic

5.the production ability strong, 21 production lines-3200 tons per month

6.meet the GB standard


Package and delivery time

Packing-- 10pcs/bundle, nude package with plastic strip

MOQ- 10tons, can negotiate

Delivery time-- commonly 2 weeks after received the 30% deposit

FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

 

Pictures:

Furring Channel and U channel for CeilingFurring Channel and U channel for Ceiling