FRP Desulfurization-Integral Fume Pipe and Tower

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1 m²

Supply Capability:1000 m²/month

Product Description:

Product Description:

So called “Integral fume pipe and tower” means: waste gas produced by power plant will not be exhausted from the chimney, but from FRP fume pipe to hyperbola cooling tower. The FRP fume pipe will exhaust the desulfurization waste gas

 Scope of Application of the Pipe

So called “Integral fume pipe and tower” means: waste gas produced by power plant will not be exhausted from the chimney, but from FRP fume pipe to hyperbola cooling tower. The FRP fume pipe will exhaust the desulfurization waste gas to the upper air. FRP fume pipe and tower is integral, which composites the exhaust system for waste gas. Reason for selection of FRP material as fume pipe in this project is: it has good corrosion resistant property, long durable property, long service life, and cost saving. Service life of FRP pipe is 30 years long which match the life cycle of thermal power plant, avoid economic loss and trouble caused by replacement of pipe. FRP pipe itself has good corrosion resistant property, which saves the corrosion resistant fee for normal pipe. Meantime, self-weight of FRP pipe is light, no need of support, which saves construction fee of support.

For integral fume pipe and tower, application of FRP fume pipe is significant on environmental protection. Technology of “integral fume pipe and tower” was developed by Germany. Until now, it is already applied in just 4 European countries, such as Germany. Adopting cooling tower to exhaust waste gas, the clarification rate is 97.5%, especially the ground concentration of waste gas is less than from the chimney. Exhausting height of chimney is 300m, while exhausting height of cooling tower is 500m, so the extension range of treated waste gas becomes larger. Ground concentration of sulphide is less than 400mg/m3. Meantime, FRP fume pipe reduces the power consumption and running cost of thermal power plant; knock out the traditional chimney, save the civil construction fee. The application of steam in cooling tower can take away the waste gas, which knocks out the pressure-adding fan, saves equipment fee and running consumption fee of fan.


Product Advantages:

No need of transportation, easy for installation: site winding will be adopted for large scaled FRP tank, which means we transport our manufacturing equipment directly to the site to make the fabrication and installation, which solves the transportation problem for large scaled tank.

Increase the shear strength, bending strength, anti-deformation property, wind and earthquake resistant property


Main Product Features:

·    High safety.

·    Professional Service

·    Competitive pricing

     Low purchase cost

 

FAQ:

 

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within 20 days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 20 to 30 workdays.

Q4: If we can produce some pipes according to customers request?

A4: Yes, we can produce tank to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.