Frame Scaffolding in Construction by painting

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1000 kg

Supply Capability:1000 kg/month

Product Description:

1.Structure of H Frame ScaffoldingDescription 

Presented like a shape of doorFrame-connected Scaffolding includes main framehorizontal framecross bracestage board and adjustable base. In order to display frame with coupler system enough,good performance of stability,firm structure of the whole,easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

 

Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days

 

2. Main Features of Frame Scaffolding

1) Reasonable structure, simple assembly, quick operation, safety&reliability

2) Easy to transport and knock down, high efficiently, save massive manpower and resource.

3) Assembly&disassembly with hands only to improve the efficiency highly,frame-connected Scaffolding of assembly&disassembly saves half of the time than fasten steel-pipe Scaffolding,and two thirds of the time than bamboo Scaffolding.

 

3.Frame Scaffolding product pictures:

  Frame Scaffolding in Construction by painting

 4.Frame Scaffolding Product Description

 Frame Scaffolding in Construction by painting

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.