Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Thickness: | Inspection: | Standard: | |||
Material: | Certificate: |
Delivery time: | Surface treatment: | Packaging: |
Packaging Detail: | Pallet package or in bulk according to your requirements. |
Delivery Detail: | Within 15-20 days after receiving your deposit |
1. formwork steel cuplock scaffolding
2.Professional manufacturer
3.Certified by SGS,BV,ISO
4.Timely delivery
Specifications
Ringlock component | Specification (mm) | Weigtht (kg) | Material |
Standards with Spigot | 500 | 3.09 | Q235/Q345 |
1000 | 5.49 | ||
1500 | 7.90 | ||
2000 | 10.30 | ||
3000 | 15.11 | ||
3500 | 17.51 | ||
Ledgers | 750 | 3.20 | Q235 |
1000 | 4.07 | ||
1065 | 4.31 | ||
1200 | 4.78 | ||
1500 | 5.88 | ||
2000 | 7.56 | ||
2200 | 8.30 | ||
2500 | 9.35 | ||
3000 | 11.13 | ||
Ladder | 3000 | 17.80 | Q235 |
Braces | 750x2000 | 9.18 | Q235 |
1000x2000 | 9.47 | ||
1500x2000 | 10.31 | ||
2000x2000 | 11.40 | ||
2500x2000 | 12.67 | ||
3000x2000 | 14.06 |
H frame & L frame scaffolding
1)Size 1219X1700mm or 1219*1930mm,1350*2000mm,1350*2500mm,
1350*3000mm
2)Material Q235 or Q345
3)Finished painted or galvanized ,powder coated
4)Tube size 42mm*2.0mm and 25.4mm*1.8mm
5)Weight 18.5kg. 13KG
6)4 feet x 6 feet or other size can be done also.