Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:10 set
Supply Capability:10000 set/month
1.Float valves are usually installed in the standard holes of the tool joints, it is used to control the liquid flow at the bottom of the drill pipe. In the time of exchanging drill Pipe, float valve also can prevent the cutting come back from the bit nozzles.
2.Features:
Float valve fittings is a kind of BOP joint drill, it is installed float valve in the bore. Connection's threads can be designed by user, we’ll assemble float valve according to the size of the thread as per API standard.
3.The basic size of FF-M Float valve fittings
Applicable Connector Diameter
| Float valve lifter Type
| Fitting ID
| Joint length
| Both ends of the buckle type
| ||
Water hole mm | Valve diameter mm | Short type
| Long type
| |||
3½"-4¾" | FM-61 | 50.8 57.2 | 61.9 | 500 | 850 | 2⅞"IF 3½"IF |
4¾"-6½" | FM-79 | 50.8 57.2 | 80.2 | 500 | 850 | 3½"IF 4½"IF |
6½"-7¾" | FM-88 | 57.2 71.4 | 88.9 | 650 | 960 | 4½"IF |
7¾"-8" | FM-98 | 71.4 | 99.2 | 650 | 960 | 4½"IF 6⅝"REG |
Above 8" | FM-121 | 71.4 | 122.2 | 650 | 960 | 6⅝"REG |
4.Pictures
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
①How about your company?
A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirement.
②How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
③How long can we receive the product after purchase?
In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.