Loading Port:China Main Port
Payment Terms:TT or LC
Min Order Qty:-
Supply Capability:-
In the FRP .with high tensile strength, the fiberglass plays the role of reinforcement whiles the wear-resistance and pressure –resistance synthetic resin is used for bonding the fiber as the basic materials. Putting together, they commonly play the role of being in finished form and load carrier.
Feature
The wall structure of the FRP pipe is normally consisting of two parts:
Structure layer: make the continuous glass fiber woven of which is cross winded according to the design angle as the reinforcing frame. Make the synthetic resin as the bonding basic materials. Among them, the weight of fiberglass occupied about 65-70% weight of resin about 30-35%. In order to strengthen the structural stiffness, the resin and silicon sand paste could be added in the middle layer of fiberglass filament winding layer.
Specification
u 2.5” Precision injected threads opening available in 8”~16” diameter tanks
u 4” precision injected threads opening available in 18”~36” diameter tanks
u 6” Flange opening available in 42”~80” diameter tanks
u 8”~18” diameter tanks available top opening only
u 21”~80” diameter tanks available top and bottom opening
u Tripod bases available in sizes of 21”~80” diameter tanks
u Optional side opening is available
Materials
u The liner layer is PE (polyethylene) materials for 8”~36” diameter tanks
u The liner layer is FRP (fiber reinforced plastic) for 42”~80” diameter tanks
Working condition
u Operating pressure: 0.6Mpa (100psi)
u Bursting Pressure: 1.8Mpa (300psi)
u Testing pressure: 0.9Mpa (150psi)
u Working temperature: below 50 centigrade
Application
Pre RO, Ion Exchange, Water softener, water filtration, House hold water filtration, Food and beverage, water storage
Opening
u 2.5”~4” UN threads ABS opening;
u 6” Flange FRP;
u other customized manway and side flange
Advantage
u Good corrosion resistance
u High mechanical strength at low specific gravity
u Good resistance to weathering
u Light weight
u Good insulating qualities
u Provide less maintenance & repairs down time
u Easy installation
FAQ
1. How about the documents after shipment?
After shipment, we ll send all original documents to you by DHL, including Packing List.Commercial Invoice, B/L, and other certificates as required by clients.
2. What's the guarantee, in case the water tank breaks down?
The water tank has one year s guarantee. If it breaks down, generally speaking, our technician will figure out what the problem may be, according to client s feedback. Parts will be replaced for free if the problems are caused by quality fault.
3. How long is the delivery time?
For standard water tank less than 100m3, it would be 7-10 days; For non-standard water tank and customized water tank according to client s specific requirements, it would be 15 to 30 days.
PRODUCTION
FACTORY
PACAKGE