Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
OD(Inch) | 5 | 5 1/2 | 6 5/8 | 7 | 8 5/8 | 9 5/8 | 10 3/4 | 13 3/8 | 16 | 20 |
|
|
| ||||||||
Thickness(mm) | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | |||||||||
Grade | J55 | K55 | N80 | N80Q | L80 | P110 |
|
|
|
|
|
| |||||||||
standar d | API 5CT |
Ends | Plain ends, cutting, threading, beveled, flange, etc | ||
Packing | Packing in bundle with steel strips; with seaworthy package at the end; could be done with your requirement. | ||
Certification | BV, IAF, SGS,COC, ISO or as per customer | ||
Inspection | With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection, Also With Nondestructive Inspection | ||
Application | Urban construction pipe, machine structure pipe, agriculture equipment pipe, water and gas pipe, Greenhouse pipe, Building material tube, Low pressure fluid tube, Oil Industry pipe, etc | ||
Trade Terms | FOB, CFR, CIF, EXW, etc. | ||
Payment Terms | L/C, D/A, D/P, T/P Western Union, MoneyGram acceptable, T/T preferred | ||
Delivery Time | Usually within 10-30 days after receipt of deposit, ASAP | ||
Loading Port | Xingang , Tianjin | ||
Original Place | Shandong, China |