Early Removal Formwork

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Introduction
1.Early form-removal system complete technology can save a great amount of form-removal one input quantity,reduce the amount of form-removal 2/3 confiruration
2.Early form-removal system can shorten the construction period,accelerate the construction speed,imprive the work efficiently above 30%.
3.Early form-removal system can delay the life of more than 20%,save the construction cost.


Features

1. Light weight construction formwork: suitable for high-rise building and bridge construction.

2. Wide building template, maximum width of 2440 * 1220 mm, reducing the amount of joint and increasing work efficiency.

3. Construction formwork: not warp, deformation, not cracking, good water resistance, high turnover.

4. Easy demolition.


5. Corrosion resistance, no pollution to concrete surface.

6. Heat preservation performance is good.


7. Formworks can be used as bending plane template.

8. Good construction performance, construction template nails, sawing, drilling and other performance is superior to the bamboo veneer and small steel plate.

9. Flexibility: it can be processed into various shapes according to the construction projects.