Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:20000 pc
Supply Capability:3000000 pc/month
1. Structure of Cup-lock Scaffolding
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar
.5 times fast of adapter plug assembly and disassembly than normal
.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage
5. FAQ of Cup-lock Scaffolding
1) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
2) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
3) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.