Loading Port:Guangzhou
Payment Terms:TT OR LC
Min Order Qty:20 m.t.
Supply Capability:3000 m.t./month
Cup-lock System Scaffolding with Painted Steel Q235 Q345
Name | Cup-lock System Scaffolding with Painted Steel Q235 Q345 |
Place of Origin | China |
Brand name | CNBM |
Main Material | Q345 ,Q235 |
Surface Treatment | High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized. |
Color | Silver, Orange |
Certificate | SGS, EN74, ISO |
Features | Automatic Welding |
Service | OEM Service available |
MOQ | 20ton |
Payment | T/T or L/C in sight |
Delivery Time | About 20-30 days after confirmation |
Packing | in bulk or steel pallet or as your request |
production capability | 100 tons per day |
it's economical and practical
forge cup
Cup-lock System Scaffolding is a multi-purpose modular scaffolding system which can be used for all forms of access and support structures in building and construction industries, ship bulding, offshore construction and industrial maintance.
Reasonable and simple structure, high structure strength
Multifunctional
Easily and quickly erected and disassembles just a hammer needed.
Reduce labor 80% in comparison with tube and clamp scaffolding
Advantageous to transform tube and clamp scaffoldign now available.
Erection Procedure:
Standard Ledger Ladder Ladder bracket
Board bracket Brace Plan brace Caster adapter Screw base Base plate
Specification | Hot Dip Galv.(Wt.) | Electric Galv.+ Painting(Wt.) | Electric Galv.(Wt.) | Painting(Wt.) | Powder Coating(Wt.) |
Cup-lock System Standard 3000mm (9'10") | 16.85 | 16.06 | 15.90 | 16.06 | 15.90 |
Cup-lock System Standard 2500mm (8'3") | 14.18 | 13.51 | 13.38 | 13.51 | 13.38 |
Cup-lock System Ledger 3050mm (10') | 11.61 | 11.17 | 11.06 | 11.17 | 11.06 |
Cup-lock System Ledger 2745mm (9') | 10.46 | 10.06 | 9.96 | 10.06 | 9.96 |
Cup-lock System Diagonal Brace 3944 (3050x2500)mm (10'0"L x 8'3"H) | 12.04 | 11.26 | 11.15 | 11.64 | 11.15 |
Cup-lock System Diagonal Brace 3713 (2745x2500)mm (9'0"L x 8'3"H) | 11.39 | 10.65 | 10.55 | 10.65 | 10.55 |
Cup-lock System Diagonal Brace 3713 (2745x2500)mm (9'0"L x 8'3"H) | 11.39 | 10.65 | 10.55 | 10.65 | 10.55 |
Cup-lock System Double Ledger 1570mm (5'2") | 12.39 | 11.92 | 11.80 | 11.92 | 11.80 |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.