Cup-lock Scaffolding with Super Degree Steel Grade

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:20000 pc

Supply Capability:3000000 pc/month

Product Description:

1.Structure of Cup-lock Scaffolding Description:


Strong with 80 kN fresh concrete pressure per m2 allowed.

Economical due to longer service life and fewer parts.

Hire option given in selected regions.

Hot selling Cup-lock Scaffolding with low price.

The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. 


2.Main Features of Cup-lock Scaffolding:


Comperticative priceGood bearing capacity.

Stable& durable. 

Easy to assemble or dismantle.

Best price cuplock scaffold.
Steel Tube ScaffoldSystem.

Cup-lock System Scaffold.

Steel Pipe.

Cup-lock Scaffold.

Packaging & Delivery:

Packaging Detail:Pallet

Delivery Detail: 20-30 days after order confirmed.


3.Cup-lock Scaffolding Images:


Cup-lock Scaffolding with Super Degree Steel Grade



Cup-lock Scaffolding with Super Degree Steel Grade


4.Cup-lock Scaffolding Specification:


The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the  loading of the  ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect  with the  standard steady. The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

Comperticative price

Good bearing capacity
Stable& durable
Easy to assemble or dismantle.


5.FAQ of Cup-lock Scaffolding:

 

What about of our after-sale services?

Response will be carried out  in 24hours  after receiving any complain or request.

Any formwork cost can be refund after order is confirmed. If the products are not based on the requirements, there will be the relevant compensations made for you. The base collar with rosette together with the height-adjustable base plate forms the scaffolding base. The vertical standard is then placed into the base collar for further construction.