Loading Port:Tianjin
Payment Terms:TT or LC
Min Order Qty:1500 pc
Supply Capability:3000000 pc/month
1. Main Intriduction of Cup-lock Scaffolding:
Name: Cup Lock Scaffolding
Category: Scaffolding system
Material: Steel (Q235/Q345)
Size: as your requirement
Surface: Electro Galvanized/Self Color/Painted/HDG
Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.
Application:
Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering
Simple structure:
The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.
Safety and Steady:
The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.
2. The Advantages of Cup-lock Scaffolding:
Easy assembly, time and labor saving.
High load-carrying capacity.
Adaptable to various construction projects.
All elements safely connected
Highly durable
3. Images for Cup-lock Scaffolding:
4. FAQ
How to guarantee the quality of the products?
We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
Packing & Delivery
Export standerd package or as customer's requirements.
What about of our after-sale services?
Response will be carried out in 24hours after receiving any complain or request.
Any formwork cost can be refund after order is confirmed.
If the products are not based on the requirements, there will be the relevant compensations made for you.
What about the package and shipping time?
Packing: wood package and adhesive tape
Shipping: by sea
Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.