Cup-lock Scaffolding with Competitive Prices

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:20000 pc

Supply Capability:3000000 pc/month

Product Description:

1.Structure of Cup-lock Scaffolding:


Size For Standard :     

Product Name

Specifications(mm)

Weight(kg)

Standard

3000*48*3.0

15

Standard

2400*48*3.0

12.47

Standard

1800*48*3.0

9.57

Standard

1200*48*3.0

6.66

Standard

600*48*3.0

4.67


2. Main Features of Cup-lock Scaffolding:


CupLock Scaffolding is a new type of scaffolding, its researched, designed and developed referencing the advanced foreign technology of joint and accessories, good in quality and application.  

Quality: safe working, easy to assemble and heavy loading capacity.

Approved by ISO9001-2000.

Term: FOB (or upon your request).

We also undertake designing and manufacturing according to your request.


3.Pictures of Cup-lock Scaffolding:


Cup-lock Scaffolding with Competitive Prices


Cup-lock Scaffolding with Competitive Prices



4. Cup-lock Scaffolding Specification:


1.Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

2.Safety and Steady: The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady. 

3.Multi using: According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.


5. FAQ of Ring-lock Scaffolding:

 

The base collar with rosette together with the height-adjustable base plate forms the scaffolding base. The vertical       standard     is then placed into the base collar for further construction. 

Response will be carried out  in 24hours  after receiving any complain or request.

Any formwork cost can be refund after order is confirmed. If the products are not based on the requirements, there will be the relevant compensations made for you.