Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:1000 pc
Supply Capability:300000 pc/month
1.Welding Wire Description:
Standard:AWS: ER70S-6/DIN SG2/BS A5.18/JIS YGM12, LY ER50-6, GB/T: ER50-6
Wire diameter: 0.8 /0.9/ 1.0 / 1.2 / 1.6 mm
Coil diameter: 220/270 /300mm
Weight: 1/5/15 kg
Winding: inline-layered, dense
Packing: wire on plastic reels in shrink film and a cardboard box
Surface treatment:copper( Chemical coating of copper, advanced processing technology)
Sheilding Gas:fully CO2 ; 75%-95% Ar + rest of CO2 ; 95% Ar + rest of CO2
Welding Process: Gas Metal Arc Welding -- GMAW / MIG Welding Process
Applicable for single pass and multi-pass welding of carbon steel and 500 MPa grade low alloy steel and is widely used in such fields as automobile industry, construction machinery manufacturing, ship building, metallurgical and mining equipment manufacturing, bridge building, petrochemical industry and pressure vessel manufacturing, etc. Also applicable for high-speed welding of sheets and pipeline steel.
2.Main Features of Welding Wire:
CO2 gas-shielded copper-plated welding wire has excellent welding technological property: the electric arc is stable with less spattering, the appearance of welded joint is nice with good crack resistance: it applies to all-position welding.
3. Welding Wire Images
4. Welding Wire Specification
ELEMENT | C | Mn | Si | P | S | Cu | ||
ACTUAL RESULT | 0.099 | 1.54 | 0.92 | 0.015 | 0.011 | 0.03 | ||
ITEM | (Mpa) TENSILE | (Mpa) YIELD STRENGTH | (%)ELONGATION | TEST OF V MODLE IMPACT | ||||
IMPACT VALUE | TEST TEMP | |||||||
SPECIPHICATION | ≥500 | ≥420 | ≥22 | ≥27J | -20°C | CO2 | Ⅱ | |
ACTAUL RESULT | 542 | 437 | 29.3 | 79 83 81 | -20°C | CO2 | Ⅰ |
5.FAQ
1. If samples available?
Answer: We are happy to provide free samples to you.
2. If OEM available?
Answer: Yes, as we usually do.
3. What are your company normal export terms?
Answer: We normally export with CFR, CIF and FOB.
4. How many days it will take you to produce mass production for us?
Answer: Normally it will take about 7-15 days. It also depends on the quantity and production seasons.