Loading Port:China Main Port
Payment Terms:TT or LC
Min Order Qty:50 Tons m.t.
Supply Capability:5000 Tons Per Month m.t./month
Quick Details of Construction Scaffolding
1.Thickness: 2-4mm 2.outer diamiter: 35~60mm 3.materials:Q235/Q255/Q345
4.Surface:hot dip galvanized,painted galvanized.
the chemical composition of raw materials | the mechanical property of raw materials | ||||||||||
item | Chemical composition % | Item | mechanical property | ||||||||
steel | steel number | C | Mn | S | P | Si | Al | steel | yield point Mpa min | tensile strength Mpa | elongation % min |
S235GT | 1.0106 | < 0.20 | < 1.40 | < 0.045 | < 0.040 | < 0.05 | > 0.020 | S235GT | 235 | 340--520 | 24 |
Standard: BS EN39 Loose steel tubes for tube and coupler scaffolds -- Technical delivery conditions | |||||||||||
other material: A500 A, B, C , D. A53 A, B. S275, S355, C250, C350 | |||||||||||
1) surface treatment: galvanized , oiled, painted , bare | |||||||||||
2) end treatment: beveled , plain , threaded | |||||||||||
3) test:chemical component analysis, mechanical properties ,technical properties , exterior size inspection | |||||||||||
4)application: fence. Construction. | |||||||||||
5)certificate: SGS inspection | |||||||||||
6)delivery time: usually in 20--30 days | |||||||||||
7) payment term: T/T , L/C, Western Union |
Application of Construction Scaffolding
Application of Construction Scaffolding
Packing of Construction Scaffolding