Construction Hoist SC200/200 with CE ISO

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:1 set

Supply Capability:1000 set/month

Product Description:

Structure of Building Hoist


BUILDING HOIST SC200/200 

SC Hoist is a rack and pinion EL. Lift, used on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grow in height. 
There're single cage and two cages hoists. A single cage can be quickly transformed into twin cages hoist by adding a cage and other parts. The hoist payload can be increased by adding counterweight equipment. 
SC hoist has reliable electrical and mechanical safety device, it is efficient and safety vertical transporting equipment. 

Steelwork of construction hoist is shaped through semiautomatic gas-protection welding with high-quality steel. 

The steelwork surface is processed with phosphating and finish baking treatment or hot galvanizing treatment 

According to customers' requirements. 

The suspension cages can be decorated with steel wire mesh or perforated aluminum plate.


Building hoist Specifiction


ParametersUnitParameter
Max. Loadkg2×2000
Max. Passengers
2×25
Rated Lifting Speedm/min0-34.4
Free standing heightm50
Max. Lifting Heightm400
Max. Free End Height of Guidesm7.5
Modulus         8
Carriage Weightkg1012×2
Size of Carriagem3×1.3×2.3
Standard Knot Weightkg146
Dimension of mast section m0.65×0.65×1.508
Motor


Rated PowerKw3×18.5 
Rated Rotate Speedr/min1460
ReducerCenter Distancemm125
Ratio
1:16
Over speed GovernorTypeprogressive  type 
ModelSAJ40-1.2A safety device
Operation Speedm/min51.6
Brake MomentN.m≥3000
Crane Weightt22


Building Hoist Images

Construction Hoist SC200/200 with CE ISO

Construction Hoist SC200/200 with CE ISO

Construction Hoist SC200/200 with CE ISOConstruction Hoist SC200/200 with CE ISO

Construction Hoist SC200/200 with CE ISO

Construction Hoist SC200/200 with CE ISO


FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience