Concrete Wire Lifting Loops for Concrete Construction

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:100 pc

Supply Capability:10000 pc/month

Product Description:

Wire lifting loops for concrete construction
1.Specifications:
1) Products: lifting socket, lifting insert, bend and waved socket, transport socket, flat socket, socket with bar and others
2) Material: stainless 304/316, ST52.3
3) Diameter: M/RD 12-36mm 
3) Length: 40-200mm
   Capacity: 0.5-12.5MT
   Break load: ≥111kN
   Test strength: 1800-2080kN
   Repeatedly bending times: 13-16
6) Surface: plain, galvanized


2. Packaging and delivery:
Packaging details: goods are packed in cartons and then in pallets
Delivery lead time: within 25 days after confirming order


3. Primary competitive advantages:
 1)More than 10 years focus on building material manufacturing
 2)Prompt delivery time within 25 days after confirming order
 3)Eathu's products are enhanced by QA and quality control checks during production, if necessary each order can be sent out with certificate referring back to test
 4)Precast concrete elements may be lifted several times after casting and during storage and erection-by using this system, designer and the worker manager ensure that each lift is carried out safely and quickly


Market:

Asia

Australasia

Central/South America

Mid East/Africa

North America

Western Europe


FAQ:
 
Q1: How long about delivery time  Concrete transport socket  ?
A1: The delivery time will be very short, normally we keep the raw materials for old customers and sometime we 
also keep stock products to 

make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete transport socket ?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
 

Concrete Wire Lifting Loops for Concrete Construction

Concrete Wire Lifting Loops for Concrete Construction