Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:1 unit
Supply Capability:500 unit/month
Detailed Description
The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
2.Advanced hydraulic system which change direction hydraulically can run without electrical part.
3.Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.
4.Tungsten steel glasses shaped plate and cutting ring guarantee long using life.
5.Hydraulic outriggers make easily positioning.
6.Pump can be easily washed.
Max concrete conveying capacity | 81 |
Max output pressure | 16 |
Max delivery distance(horizontal/vertical) | 1500/350 |
Concrete slump range | 160-250 |
Feeder capacity | 0.8 |
Feeding height | 1400 |
Concrete delivery cylinder | 200*1600 |
Main oil cylinder | Φ125*Φ80*1600 |
Motor power | 110 |
Main hydraulic pump | Rexroth |
Main hydraulic pump delivery capacity | 260 |
Main hydraulic pressure | 32 |
Hydraulic tank volume | 580 |
Max trailing speed | 8 |
Remarks | S-valve |
Outside demesion(L*W*H) | 6800*2150*2300 |
Weight |